SUBSCRIBE / FOLLOW US:
Subscribe to Differ     Follow Differ on Twitter     Follow Differ on LinkedIn
About
Investments
Advisory
Analysis
News
Contact
Published: 29 May 2013
Traditionally, hydropower has been developed in large scale, typically 10+MW, where each project has been engineered and tailored. This is not possible for small-scale projects as the engineering costs would have made the projects too expensive and non-profitable. The technologies going into small projects should therefore be standardised to fit various kinds of conditions in order to make replication in developing countries possible. This analysis provides an overview of available hydropower technologies for this and assess whether there are any technologies that are more likely to succeed than others. 


PDF Icon  Download Report  


< Back    Analysis    Print this article

blog comments powered by Disqus
Differ Group   Address: Storgata 26, 0184 Oslo, Norway   |   E-mail: post@differgroup.com